Transmission Line Projects

TRANSMISSION LINE

  • Power Grid Company of Bangladesh

    Re-routing work of 132 kV Sirajgonj-sherpur transmission line and tower at Hatikamrul interchange area under the jurisdiction of Sasec Road connectivity project-ll .

  • Power Grid Company of Bangladesh

    Tower height extension by replacing one existing tower with new one and by installing one new tower of Bogura-Naogaon 132 kV double circuit transmission line for increasing ground clearance at Tinmatha Rail Gate, Bogura.

  • Power Grid Company of Bangladesh

    Supply, erection, testing, commissioning of 132 kV tower, bay equipment and associated others for line relocation at Naogaon grid substation.

  • Power Grid Company of Bangladesh

    Relocation/raising of two nos. tower with over head line in existing Ashugong-Serajgong 230 kV transmission line for railway tracks of Bangabandhu Sheikh Mujib Railway construction project ( BSMRBCP).

  • Power Grid Company of Bangladesh

    Removal of tower no.182 of 400 kV BibianaKaliakar transmission line and construction of new river crossing tower at the site and its related necessary works .

  • Power Grid Company of Bangladesh

    Construction of tower between 17-18 no tower of Saidpur-Rangpur 132 kV transmission line at Saidpur grid sub station.

  • Power Grid Company of Bangladesh

    Bypassing by ERS of tower no 32 of SiddirgonjManiknagar 230 kV transmission line.

  • Power Grid Company of Bangladesh

    Bypassing by ERS of tower no 32 of SiddirgonjManiknagar 230 kV transmission line.

  • Power Grid Company of Bangladesh

    Construction of power transmission line of 230 kV Hasnabad-Shyampur line at Aliganj, Narayanganj.

  • Power Grid Company of Bangladesh

    Rerouting of Halishahar-Julda 132 kV SC overhead transmission line to increase ground clearance at Saltgola, Chattogram.

  • Power Grid Company of Bangladesh

    Construction of new 132 kV bypass line including tower supply by shifting existing 132 kV line.

  • Summit

    Design, supply, erection, testing and commissioning of power evacuation infrastructure of summit meghnaghat 337mw dual-fuel CCP.